Optimum scheduling of a hydrothermal power system with variable head hydroplants is discussed. Functional analysis is Used to obtain the optimum solution for the scheduling problem. The problem is formulated as a minimum norm problem. The optimum solution found is unique and is easily shown to agree with the solution found for a simpler problem formulated earlier. An example is given to illustrate the results obtained.